WhatsApp us

Flooring and tiling

Flooring and tiling

Flooring in Singapore for HDB flats, condos and landed homes: vinyl and SPC laid over old tiles, or new tiles after hacking. Send photos and a floor size for a price.

  • Vinyl needs no HDB permit
  • Written price before any work starts
  • Flooring workmanship under warranty for 12 months
  • Vinyl or SPC flooring, 5 mm click, laid over tilesQuote
  • Vinyl flooring, one bedroomfrom S$750
  • Vinyl flooring, 4-room HDB living and diningfrom S$900

Jump to a flooring and tiling topic

Flooring and tiling jobs we do

Two routes lead to a new floor: lay vinyl over the tiles you have, or take the old tiles up and lay new ones. We do both.

  • Vinyl and SPC, laid over old tiles

    A 5 mm click floor laid over your existing tiles, with no hacking. Supplied and laid, priced per square foot.

    from S$6.50 psf
  • One bedroom in vinyl

    A single bedroom done on its own, which suits an old room or a child's room that you want to change first.

    from S$750
  • 4-room HDB living and dining

    The main living area of a 4-room flat in one go, so the floor runs from the door to the dining table.

    from S$900
  • Floor hacking and disposal

    Old floor tiles removed and taken away, when you want new tiles or a level surface. Needs an HDB permit and restricted hours.

    from S$5 psf
  • New floor and wall tiles

    Tiles supplied and laid after a visit, with the waterproofing and screed that the rules require in wet areas.

    Quote after a visit

Flooring in Singapore: vinyl over tiles, or new tiles

Most Singapore homes already have a tiled floor, so the first question is whether to keep it. Laying vinyl or SPC over the existing tiles is the quicker, quieter route. It needs no hacking and no HDB permit. Taking the tiles up and laying new ones is a bigger job with a permit, restricted working hours and a lot of dust and noise.

We help you choose before you spend. Send photos of the floor, the rough size of each room and your flat type. If the tiles are loose, hollow-sounding or cracked, we say so, because a floor laid over a loose tile will not stay flat. For the full list of what goes where, see vinyl and SPC flooring and floor and wall tiling.

Prices are for labour, starting from. Parts are extra and listed on your written quote, so you see the full price before we start.

Vinyl or new floor tiles: how the two jobs differ

The same room can go either way. This is how the jobs compare in an HDB flat.

Vinyl or SPC over old tilesNew floor tiles
HDB permitNone neededNeeded. Our HDB-registered contractor applies for it
HackingNone. It is laid over the tiles you haveOld tiles hacked off and taken away first
Working hoursOrdinary renovation hoursRestricted hours for the hacking and tile cutting
Pricefrom S$6.50 psf, supplied and laidfrom S$5 psf for hacking, tiles quoted after a visit
Who does itOur own handyman teamAn HDB-registered renovation contractor

Both routes are also covered in our guide to HDB renovation permits.

Flooring prices

Starting prices for labour, with vinyl supplied and laid. Tiles and any extras are listed on your written quote.

  • Vinyl or SPC flooring, 5 mm click, laid over tilessupplied and laid
    from S$6.50 psf
  • Vinyl flooring, one bedroomsupplied and laid
    from S$750
  • Vinyl flooring, 4-room HDB living and diningsupplied and laid
    from S$900
  • Floor hacking and disposalHDB-registered contractor
    from S$5 psf
  • Floor tiles, supply and layHDB-registered contractor
    Quote after a visit

Minimum charge S$80 per visit. Bigger jobs get a fixed written quote after a free look at photos, or after a site visit.

Who does the work, permits and warranty

Who does the work

Vinyl and SPC flooring is laid by our own handyman team, which needs no licence. Hacking and tile replacement in HDB flats are done by an HDB-registered renovation contractor, listed in HDB's Directory of Renovation Contractors.

HDB permit

Laying vinyl needs no HDB permit. Replacing floor tiles, and the hacking before it, needs an HDB renovation permit. Our HDB-registered contractor applies for it before work starts.

Sometimes needed

Warranty

12 months

Workmanship warranty on this work.

How a flooring job works

  1. 1

    Send photos and sizes

    The floor, each room's rough size, flat type and postal code.

  2. 2

    Get a written quote

    A price per square foot for vinyl, or a quote after a visit for tiles.

  3. 3

    We prepare and lay

    Furniture is moved, the floor is checked and prepared, then laid.

  4. 4

    Check, then pay

    Walk the floor, check the joints and edges, then pay by PayNow or card.

Before the flooring team arrives

Clear the rooms as far as you can, and tell us which furniture stays. Heavy items such as wardrobes are best moved by you or us before the work, not during it.

Take photos of any loose, hollow or cracked tiles, and point out damp patches, since moisture under a floor is a problem we need to know about first. If a toilet or kitchen floor is part of the job, say so, because wet areas follow different rules. See waterproofing a toilet.

If you are painting as well, do the flooring last so the paint is not marked: see painting. Our price guide for vinyl flooring explains how the market prices compare.

Frequently asked questions

Is flooring in Singapore cheaper over old tiles?

Usually, because there is no hacking. Vinyl laid over tiles is from S$6.50 psf, while new tiles also need floor hacking at from S$5 psf and a permit in HDB.

Do I need an HDB permit to lay vinyl flooring?

No. HDB does not require a permit for laying vinyl. Replacing floor tiles does need one, and our HDB-registered contractor applies for it.

Can vinyl go over my existing floor tiles?

Often, yes, if the tiles are firmly stuck and reasonably level. We check your photos, and the floor on the day, before we confirm the price.

Can you lay tiles in my toilet or kitchen?

Yes, as part of a job planned with the waterproofing rules for wet areas. Removing toilet floor and wall finishes is not allowed in the first 3 years after a new block is completed.

How long will my HDB flooring job take?

Vinyl is a short job. Tiling is longer, and HDB requires works in an existing block to finish within one month of the permit date. We give you the schedule with your quote.

Is flooring work under warranty?

Yes. Our flooring workmanship is under warranty for 12 months. Tell us about any lifted joint or loose tile, and we will look at it.

Send a photo. Get a fixed price.

WhatsApp us a photo or a short video of the problem, with your postal code. We reply with a price the same working day.

  1. Send a photoWhatsApp us a photo or a short video of the problem, with your postal code.
  2. Get a fixed priceWe reply with a price, or book a visit when a job needs a look first.
  3. We fix itThe right tradesman for the job arrives in the time slot you booked.
  4. Pay when it's donePay by PayNow or card after the work is finished and you have checked it.
WhatsAppGet a price