For a redo in an HDB flat, the rules set out the build. HDB requires a pre-packed waterproofing screed and a waterproofing membrane before the new floor finish goes down. The membrane must be turned up at least 150 mm against walls, kerbs and pipes, and the floor trap grating must have a long collar. These are the details where water often gets through, so we check them on every job.
Once the membrane is in, we hold water on the floor and, with your neighbour's help, watch for drops below. That is the ponding test included in our no-hacking price (from S$900). It shows that the work holds before the tiles go on, or before we leave a no-hacking job.
If your leak turns out to come from a pipe, the plumber repairs it instead. Our page on ceiling and roof leaks explains how we trace a source, and our team can clear a choked floor trap if the trap is the problem.