Toilet renovation in Singapore: what is done, and in what order

A toilet renovation in an HDB flat or a condo is a series of jobs that have to happen in the right order. Getting the order wrong is one way leaks start. This is how ours runs.

First the old finishes come off: wall and floor tiles are hacked and the debris is removed. Then the pipes and any wiring are checked and moved if needed. Next comes the waterproofing, which is the layer that stops leaks into the flat below. Only after that do the new tiles, the toilet bowl, the basin and the taps go in. Last, the shower screen and the mirror cabinet.

In an HDB flat, the hacking and the tile replacement need a permit, and the waterproofing has set rules: a waterproofing screed, a membrane over the whole floor and the membrane turned up at least 150 mm at the walls. Our toilet waterproofing page explains the layers. We do not skip the water test at the end.

Toilet and kitchen renovation prices

A full renovation is quoted after a visit, because every flat is different. The floor and wall redo prices below are for the waterproofing and tiling work only, starting from, and labour only.

  • Toilet renovationHDB-registered contractor
    Quote after a visit
  • Kitchen renovationHDB-registered contractor
    Quote after a visit
  • Toilet floor redo with new waterproofingHDB-registered contractor
    from S$1,100
  • Toilet floor and walls redo with new waterproofingHDB-registered contractor
    from S$1,900

Prices are for labour, starting from. Parts are extra and listed on your written quote, so you see the full price before we start.

Who does the work, permits and warranty

Who does the work

An HDB-registered renovation contractor, listed in HDB's Directory of Renovation Contractors, does the hacking, tiling and waterproofing in an HDB flat. A PUB Licensed Plumber fits the toilet bowl and does water pipe work, and an EMA Licensed Electrical Worker (LEW) does any wiring.

HDB permit

An HDB renovation permit is needed to hack or replace toilet and kitchen finishes. Our HDB-registered contractor applies for it. A new flat's toilet finishes cannot be removed in its first 3 years.

Permit needed

Warranty

12 months

Workmanship warranty on this work.

Kitchen renovation: what is different

A kitchen renovation in an HDB flat follows its own rules. Waterproofing is lighter than in a toilet: the rules call for a waterproofing screed and a membrane only around the sanitary stacks, in a 400 mm radius. Floor finishes plus screed must stay within 50 mm in total, and wall finishes with plaster within 25 mm. Removing the old tiles needs a permit, but laying new wall tiles over the existing ones with adhesive can avoid it, if HDB's conditions are met.

We check which route your kitchen allows before we quote. Cabinets, hob and hood are fitted last. A gas hob is connected by an EMA licensed gas service worker, as HDB requires for gas work, and a new power point by an LEW. The sink is fitted by our team and the water pipes behind it are done by a PUB Licensed Plumber. For taps and bowls, see our toilet bowl and tap replacement page.

If you want a glass shower screen to finish the toilet, our glass and aluminium team measures for it after the tiles are in.

Rules for HDB toilet and kitchen renovation

  • Noisy work has set hours. Hacking and removing tiles are allowed only from 9am to 5pm on weekdays.
  • A new flat has a 3-year wait. Toilet floor and wall finishes cannot be removed in the first 3 years after the block is completed.
  • Debris cannot go down the chute. Debris must not go down the refuse chute, the toilet squat pan or the floor trap, so we remove it from site.
  • Hacking beyond finishes is not allowed. Structural walls, columns, beams and slabs cannot be hacked.
  • Condos have their own rules. The management corporation usually sets the hours and the deposit, and we check them before we book.

Plan a toilet renovation for when you can do without the toilet. If it is your only toilet, tell us, and we will plan the job in the shortest steps.

Frequently asked questions

How much does a toilet renovation cost in Singapore?

A full toilet renovation is quoted after a visit. The floor-only waterproofing and tiling work starts from S$1,100, and floor and walls from S$1,900, before tiles and fittings.

Can I just renovate the kitchen floor?

Yes. Removing old tiles needs an HDB permit, and the floor must stay within 50 mm of finishes and screed. We check the route that fits your kitchen before we quote.

Who fits the new toilet bowl?

A PUB Licensed Plumber, as HDB requires for fitting or replacing a toilet bowl and sealing the waste pipe. The plumber's name is on your booking.

Do I need to move out during the renovation?

Not always. A single toilet can be done while you stay, if you have another one. We tell you how long you will be without the room.

How long does a toilet renovation take?

It depends on the size and the tiling. HDB works in an existing block must finish within one month of the permit date. We give you the programme on the quote.

Send a photo. Get a fixed price.

WhatsApp us a photo or a short video of the problem, with your postal code. We reply with a price the same working day.

  1. Send a photoWhatsApp us a photo or a short video of the problem, with your postal code.
  2. Get a fixed priceWe reply with a price, or book a visit when a job needs a look first.
  3. We fix itThe right tradesman for the job arrives in the time slot you booked.
  4. Pay when it's donePay by PayNow or card after the work is finished and you have checked it.
WhatsAppGet a price